A new study commissioned by the Australian Renewable Energy Agency (ARENA) has found that a move towards smarter electricity network regulation would improve reliability, reduce emissions and cut power bills for energy users.

The study found that the current regulatory framework favours investing in network infrastructure – such as new poles and wires – over demand management involving energy providers helping consumers to reduce their power demand and bills.

The study, undertaken by the Institute for Sustainable Futures (ISF) at the University of Technology Sydney, found that building new grid infrastructure was more profitable for network businesses than demand management solutions.

ISF Project Director, Chris Dunstan, said demand management includes offering incentives to help customers save energy through smarter, more efficient appliances and voluntarily shifting energy use from peak periods.

Removing the regulatory bias against demand management could also deliver more power capacity than a Hazelwood power station

“Our study has found a clear and quantifiable bias in the regulatory incentives in favour of building network infrastructure over energy saving, local generation and storage solutions, which would offer a better deal for customers.

“Intelligently reducing electricity demand can be just as useful as increasing supply, and is often cheaper and quicker to achieve,” Mr Dunstan said.

The study was in part intended to assist the Australian Energy Regulator (AER) which is currently developing a Demand Management Incentive Scheme. The new scheme is intended to create a level playing field for network demand management.

ARENA Chief Executive Officer, Ivor Frischknecht, said the study was an important contribution to understanding how to support the reliable and affordable integration of variable renewable energy into the electricity grid.

“Having more variable renewable energy in our electricity system means we will also need more flexible resources to balance the system.

“Batteries can help provide this flexibility but in many cases it may be simpler, cleaner and cheaper for electricity networks to work with customers to reduce or shift power demand,” Mr Frischknecht said.

“Demand management also allows more efficient use of our existing network assets and reduces the need for network investment.”

Summary of Findings

  • The study has revealed significant bias against demand management in Australia’s national electricity regulations
  • The study examined four generic scenarios of supply constraints in the grid as case studies, and compared the cost and benefits of network infrastructure and demand management solutions
  • Analysis of these scenarios found that bias in economic incentives meant that investing in new network infrastructure was often more profitable for network businesses, even where demand management solutions were found to deliver lower costs for consumers
  • The study concluded that creating incentives for demand management would improve reliability and reduce carbon emissions while also reducing power bills
  • The ISF study was in part intended to assist the AER in designing a Demand Management Incentive Scheme
  • The first recommendation is to “normalise” demand management cost recovery and put demand management expenditure on an equal footing with network capital expenditure
  • The second recommendation is to provide a specific Demand Management Incentive to level the playing field for demand management and to compensate network businesses for passing on the benefits of demand management to consumers

The study included extensive consultation with network businesses, demand management providers, regulators, government and consumer representatives.

©2024 Utility Magazine. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?